And once again, the WINDFORCE Offshore Wind and Hydrogen Conference 2024, organized by WAB e.V., will take place from 10 to 12 June 2024 on the premises of our subsidiary Stahlbau Nord GmbH.
A pontoon measuring 20 x 30 x 3.95 m plus an overhang of 5 x 30 m with a total weight of 385 tons was manufactured for the Mützelfeldt shipyard of BREDO DRY DOCKS as a replacement for a defective pontoon.
On Friday, December 15, 2023, thyssenkrupp Marine Systems welcomed the Egyptian Navy to the Stahlbau Nord site in Bremerhaven to hand over the third MEKO A200 frigate "AL QADEER".
On December 15, 2023, Stahlbau Nord and Rönner Verwaltungsgesellschaft held their Christmas party at the Apollo Bremerhaven. Together, they celebrated the successes of the year and look forward to 2024 with confidence.
The ship Buxfavourite, managed by the NSB GROUP in Buxtehude, left the shipyard of Stahlbau Nord GmbH (sbn) after a short laytime with 19 new hatch covers and revised piping to the seawater filter.
In addition to the start of the apprenticeship, a special anniversary was celebrated last Friday on the company premises of Stahlbau Nord with more than 900 people.